Duplexes & Triplexes
Two and three unit residential buildings built ground-up or as tear-down rebuilds on existing lots. ATP manages architecture, permitting, and construction as a coordinated process from site preparation through final inspection.
From duplexes and triplexes to small apartment buildings and mixed-use residential — ATP manages multi-family construction from design and permitting through delivery, coordinated under one experienced team.
ATP builds across the full spectrum of multi-family residential construction — from two-unit duplexes to larger apartment and mixed-use developments. Every project is managed with the same structured approach regardless of unit count or complexity.
Two and three unit residential buildings built ground-up or as tear-down rebuilds on existing lots. ATP manages architecture, permitting, and construction as a coordinated process from site preparation through final inspection.
Four units and above — ATP manages the full development process including architectural planning, structural engineering, permitting, and construction coordination through certificate of occupancy.
Ground-floor commercial with residential units above — ATP coordinates the added complexity of mixed-use zoning, dual occupancy requirements, and multi-department permitting that these projects require.
When an existing structure no longer maximizes a property's development potential, ATP coordinates the full demolition and multi-family rebuild process from site clearance through a completed income-producing asset.
Multi-family development involves a higher level of coordination than single-family construction — more units, more departments, more trades, and more moving parts. ATP manages the full scope so your project stays on schedule and on budget.
Permit-ready architectural plans, unit layouts, site planning, and all documentation required for multi-family plan check submission — tailored to your lot, zoning, and development goals.
Engineered structural plans, foundation design, and soils coordination aligned with city and county requirements for multi-family occupancy before submission.
Full plan submission, zoning review, multi-department coordination, and correction management through permit approval. ATP handles all communication with Planning and Building & Safety directly.
Grading, earth mobilization, excavation, and site preparation coordinated before foundation work begins — including retaining systems where site conditions require.
Reinforced foundations, structural framing, and building systems built to engineered specifications and city-approved plans for multi-family occupancy loads.
Electrical, plumbing, mechanical, insulation, and fire sprinklers coordinated under ATP across all units — sequenced and managed to keep the project on schedule.
Interior finishes, fixtures, flooring, and all unit details carried through to certificate of occupancy and project handover.
Dedicated project management from pre-construction through delivery — scheduling, subcontractor coordination, milestone updates, inspection management, and certificate of occupancy coordination.
Multi-family development follows a structured process — from initial feasibility through certificate of occupancy. Here's how ATP moves your project forward at every phase.
ATP reviews your property, zoning entitlements, unit count potential, and development goals. This is where we determine scope, identify site constraints, and outline the full path from design through delivery. No commitment required at this stage.
ATP develops permit-ready architectural and structural plans tailored to your lot, zoning requirements, and unit configuration. Engineering coordination, soils reports, and all documentation required for multi-family plan check are completed during this phase.
ATP submits your plans to the appropriate city and county departments, manages zoning review, responds to plan check corrections, and coordinates with Building & Safety through full permit approval.
With permits approved, ATP finalizes scheduling, procures materials, coordinates trades across all units, and prepares your site for mobilization.
Your multi-family project is built with active project management, milestone updates, and full trade coordination — foundation through finish across every unit.
ATP coordinates all final inspections, manages certificate of occupancy sign-off, and delivers the completed project ready for occupancy and leasing.
ATP builds multi-family projects throughout Pasadena and surrounding communities across Los Angeles. Our familiarity with local zoning ordinances, multi-family entitlement processes, and city permitting allows us to navigate approvals efficiently across every jurisdiction we serve.
Don't see your city listed? Contact us — ATP serves investors and developers throughout Los Angeles and can confirm coverage for your specific project location.

ATP builds across the full spectrum of multi-family residential construction — from duplexes and triplexes through small apartment buildings and mixed-use developments. Project scope and feasibility are reviewed during consultation.
Yes. ATP manages ground-up multi-family construction on vacant or cleared lots, as well as tear-down and rebuild projects where an existing structure is being replaced to maximize a property's development potential.
Yes. ATP works with investors and developers who are not local to Los Angeles. We provide structured project updates and manage the full scope locally on your behalf — from design and permitting through certificate of occupancy.
Multi-family projects typically require coordination across Planning, Building & Safety, and additional departments depending on project scope and jurisdiction. ATP manages all submissions, correction responses, and department coordination directly — you are not responsible for managing the permitting process.
Yes. ATP coordinates the added complexity of mixed-use zoning, dual occupancy requirements, and multi-department permitting that these projects require.
No. ATP provides coordinated architectural and engineering services for multi-family projects. If you have existing plans, ATP can review them for constructability and code compliance before moving into the construction phase.
Multi-family construction costs are influenced by unit count, square footage, structural complexity, foundation requirements, site conditions, material selections, and city code requirements. ATP reviews all of these factors during consultation to provide accurate project pricing.
Yes. Just as investors evaluate contractors, ATP takes time during consultation to ensure your project is the right fit for our team. That process protects both parties and sets the foundation for a successful development.
Schedule a consultation to review your property, development goals, and the path forward toward design, permitting, and construction.
ATP builds multi-family projects for investors and developers throughout Pasadena and Los Angeles.